Cambridge Apartments case study

CASE STUDY: CAMBRIDGE APARTMENTS The Challenge: Simon Construction needed all-weather protection, full exterior access and an efficient means to transport materials at height during this central Christchurch apartment repair. The Detail: Located in the heart of Christchurch, the Cambridge Apartments is a residential complex made up of four blocks. Main contractor, Simon Construction, was tasked [...]

Carlton Mill Rd Case Study

CASE STUDY: CARLTON MILL ROAD The Challenge: The new owners of this ten-storey apartment building in Christchurch required all-weather access to complete crack injection work, painting, re-glazing and roof repairs. The Detail: Upright’s ability to provide safe, encapsulated access was critical to the success of this project. The Upright team included a registered engineer to [...]

Airforce Museum case study

WIGRAM AIR FORCE MUSEUM 0trusses 0decks 0tonnes of scaffold The Challenge: To reroof the 85m long Wigram Airforce Museum Aircraft Hall and maintain safe public access to the WWII-era exhibits below. The Detail: Aircraft Hall is the main hanger at Wigram Airforce Museum in Christchurch. Built during WWII, it now houses over a dozen priceless, [...]
WE'RE HERE TO HELP

GET IN TOUCH TODAY